Електрична частина гідроелектростанції потужністю 300 МВт з аналізом навантажувальної здатності силових трансформаторів

Вантажиться...
Ескіз

Дата

Назва журналу

Номер ISSN

Назва тому

DOI

Анотація

The master's thesis consists of five sections and a graphic part. The first section provides a feasibility study for the construction of hydropower plants. The second section is the electrical part, where the calculation of schedules of electrical loads, the choice of main and auxiliary equipment, the structural scheme of the station, the scheme of VRU-110 kV and the scheme of own needs 0.4 kV, as well as switching equipment, flexible and rigid buses, measuring transformers, surge arresters, battery, lightning protection and grounding calculation for 110 kV VRU. The third section is devoted to the study of HPP automation systems The fourth section provides the main technical and economic indicators of the station. The fifth section describes health and safety measures in emergencies.

Опис

Навчальний керівник: канд. техн. наук, доц. Бевз С. В.

Ключові слова

УДК

Тип документа

Мова

Є частиною

ISSN

Бібліографічний опис

Електрична частина гідроелектростанції потужністю 300 МВт з аналізом навантажувальної здатності силових трансформаторів [Електронний ресурс] : [презентація] / викон. В. Р. Данець ; Вінницький національний технічний університет ; Факультет електроенергетики та електромеханіки ; Кафедра електричних станцій та систем. – Електронні текстові дані (1 файл: 0,407 Мбайт). – Вінниця, 2020. – Назва з екрана.