<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">

The Method of the Secondary Arc Suppression in Cycle Single-Phase Auto Reclose with High-Level Penetration Renewable Energy Sources

dc.contributor.authorBelik, M.en
dc.contributor.authorKuchanskyy, V.en
dc.contributor.authorRubanenko, O.en
dc.contributor.authorРубаненко, О. О.uk
dc.contributor.advisorsecondary arc currenten
dc.contributor.advisorrecovery voltageen
dc.contributor.advisorsingle-phase automatic reclosingen
dc.titleThe Method of the Secondary Arc Suppression in Cycle Single-Phase Auto Reclose with High-Level Penetration Renewable Energy Sourcesen
dc.date.issued2023
dc.publisherMultidisciplinary Digital Publishing Instituteen
dc.identifier.citationBelik M., Kuchanskyy V., Rubanenko O. The Method of the Secondary Arc Suppression in Cycle Single-Phase Auto Reclose with High-Level Penetration Renewable Energy Sources. Energies. 2023. Vol. 16, № 19. Art. no. 6880. DOI: https://doi.org/10.3390/en16196880.en
dc.relation.ispartofEnergies. Vol. 16, № 19 : 6880.en
dc.identifier.doihttps://doi.org/10.3390/en16196880
dc.identifier.urihttp://ir.lib.vntu.edu.ua/handle/123456789/39048
dc.description.abstractRenewable energy sources have a multifaceted impact on power grids, ranging the reliability and quality of electricity to the ive impact on equipment. While renewables used to be distributed in distribution networks, now their capacity is commensurate with thermal power plants and their impact on the grid should not be underestimated. According to the statistics on the interruption of the bulk electric networks, one of the main reasons for emergency shutdowns of extra high-voltage power lines are single-phase short circuits. The problem of mathematical modeling of the limit modes in terms of static stability is very relevant to the design and operation of electric power systems (EPS). Calculations of limit modes have both an independent value and a component of other electrical engineering tasks related to ensuring the required level of reliability and cost-effectiveness of the operation of the united PS. Despite the great degree of development of issues of planning and control of electric modes, system accidents associated with unacceptable loads of network elements occur in the Ukrainian energy industry.en
dc.subjectstatic thyristor compensatorsen
dc.typeArticle
dc.language.isoenen
dc.date.accessioned2024-01-18T08:44:31Z
dc.date.available2024-01-18T08:44:31Z

Файли

Контейнер файлів

Зараз показуємо 1 - 1 з 1
Вантажиться...
Ескіз
Назва:
140918.pdf
Розмір:
2,76 MB
Формат:
Adobe Portable Document Format

Ліцензійна угода

Зараз показуємо 1 - 1 з 1
Вантажиться...
Ескіз
Назва:
license.txt
Розмір:
129 B
Формат:
Plain Text
Опис: