Електрична частина гідроелектростанції потужністю 90 МВт з агрегатами типу СВ-546/110-32 з дослідженням питань експлуатації електрообладнання розподільних установок

Вантажиться...
Ескіз

Дата

Назва журналу

Номер ISSN

Назва тому

DOI

Анотація

In the master's qualification work the electric part of the hydroelectric power plant (HPP) with the capacity of 90 MW is designed. The feasibility study for the design of the HPP has been completed. The calculation of electric load schedules was carried out, the main and auxiliary equipment was selected. Made a choice of the structural scheme of the station, the circuit of an open distribution device (ODD) of 110 kV and the schemes of own needs; switching equipment, bus controllers, measuring transformers, surge suppressors, battery storage. The calculation of the lightning protection of the ODD-110 kV was performed. The main requirements for distributive installations of electric power stations and substations, and issues of operation and maintenance of electric equipment are considered. In the section of labor protection the analysis of potentially hazardous and harmful production factors at the power plant has been carried out and the measures of safety of life of personnel in emergency situations have been proposed.

Опис

Науковий керівник: канд. техн. наук, доц. Тептя В. В.

УДК

Тип документа

Мова

Є частиною

ISSN

Бібліографічний опис

Електрична частина гідроелектростанції потужністю 90 МВт з агрегатами типу СВ-546/110-32 з дослідженням питань експлуатації електрообладнання розподільних установок [Електронний ресурс] : [презентація] / викон. С. І. Воронков ; Вінницький національний технічний університет ; Факультет електроенергетики та електромеханіки ; Кафедра електричних станцій і систем. – Електронні текстові дані (1 файл: 1,28 Мбайт). – Вінниця, 2019. – Назва з екрана.

Схвалення

Рецензія

Доповнено

Цитується в