dc.contributor.author | Perepelytsia, V. | en |
dc.contributor.author | Kozlov, L. | en |
dc.contributor.author | Buriennikov, Iu. | en |
dc.contributor.author | Burennikova, N. | en |
dc.contributor.author | Kozlov, S. | en |
dc.contributor.author | Rusu, O. | en |
dc.contributor.author | Rusu, I. | en |
dc.contributor.author | Перепелиця, В. І. | uk |
dc.contributor.author | Козлов, Л. Г. | uk |
dc.contributor.author | Бурєнніков, Ю. А. | uk |
dc.contributor.author | Бурєннікова, Н. В. | uk |
dc.contributor.author | Козлов, С. Л. | uk |
dc.date.accessioned | 2024-01-17T13:29:24Z | |
dc.date.available | 2024-01-17T13:29:24Z | |
dc.date.issued | 2024 | |
dc.identifier.citation | Perepelytsia V., Kozlov L., Buriennikov Iu., Burennikova N., Kozlov S., Rusu O., Rusu I. Optimization of hydraulic drives for synchronizing working movements of automated brick production installation. International Journal of Modern Manufacturing Technologies. Vol. XV, No. 3. 2023. DOI: https://doi.org/ 10.54684/ijmmt.2023.15.3.199. | en |
dc.identifier.issn | 2067–3604 | |
dc.identifier.uri | http://ir.lib.vntu.edu.ua//handle/123456789/39038 | |
dc.description.abstract | The paper presents a version of the improved string cutting installation for forming bricks with two hydraulic
drives. A mathematical model of the movement of the traverse and the carriage of the installation, which require
synchronous actions in the process of work, has been compiled. The dependence of the total force of the technological load
and friction acting on the traverse on the movement parameters and tool geometry was obtained experimentally. The
obtained dependence was used in the development of a mathematical model, represented by a system of nonlinear
differential equations that were solved by the Rosenbrock method. A complex criterion for evaluating the efficiency of the
automatic installation was formed and the values of the structural parameters of hydraulic drives were found, in which the
errors of the geometric dimensions of the products and the power consumption will be minimal, and the productivity of the
installation will be maximal. | en |
dc.language.iso | en | en |
dc.publisher | ModTech Professional Association | en |
dc.relation.ispartof | International Journal of Modern Manufacturing Technologies. Vol. XV, No. 3. | en |
dc.subject | automatic brick forming machine | en |
dc.subject | hydraulic drives | en |
dc.subject | synchronization | en |
dc.subject | mathematical model | en |
dc.subject | complex criterion | en |
dc.subject | optimization | en |
dc.title | Optimization of hydraulic drives for synchronizing working movements of automated brick production installation | en |
dc.type | Article | |
dc.identifier.doi | https://doi.org/ 10.54684/ijmmt.2023.15.3.199 | |
dc.identifier.orcid | https://orcid.org/0000-0002-2529-1372 | |